Client: Mileway
Appointed By: GV&co
Sector: Industrial
Location: Warrington
Project Value: £1.3 Million
Programme: 31 Weeks
The Brief
• Comprehensive refurbishment and upgrade of an industrial facility • Deliver a modern and energy-efficient workspace • Improve building performance and access arrangements • Provide a durable, future-ready asset capable of supporting incoming occupiers
The Solution
• Delivered a fully coordinated refurbishment programme • Structural, architectural, civil engineering, and building services • Undertook extensive strip-out and demolition • Asbestos removal works to facilitate the redevelopment
The Outcome
• Successfully transformed the facility into a modern industrial unit • Improved energy efficiency through upgraded building • Enhanced fire safety, access arrangements, and occupier facilities • Delivered a durable, market-ready asset
The client required a comprehensive refurbishment of an existing industrial facility to improve its functionality, energy performance, and overall market appeal. The project involved coordinating a wide range of specialist work packages, including asbestos removal, building envelope upgrades, mechanical and electrical installations, and office refurbishment works.
Careful planning, quality control, and effective management were essential to ensure the works were delivered safely, efficiently, and within budget, while creating a high-quality industrial asset capable of supporting future occupiers.
Through early engagement and close collaboration with the project team, we developed a clear and well-defined scope of works aligned with the client’s objectives, budget, and programme requirements. This proactive approach enabled key project decisions to be made at an early stage and ensured efficient delivery throughout the refurbishment programme.
Working collaboratively across all disciplines, we identified opportunities to improve building performance, enhance occupier comfort, and maximise long-term asset value. Open communication and a solutions-focused approach allowed the team to respond effectively to project challenges while maintaining quality, safety, and programme objectives.
Strip-out and demolition works
Asbestos removal
New composite roof installation
Gutter refurbishment works
Cladding upgrades
External decorations
Mechanical and Electrical (M&E) design and installation
Air conditioning design and installation
Fire compartmentation works
Full office refurbishment
Resin flooring installation
Close collaboration with subcontractors, suppliers, consultants, and the client team was essential to maintain clear communication and ensure that project objectives were achieved.
The project successfully delivered a fully refurbished industrial facility with enhanced operational functionality, improved energy performance, and upgraded workplace environments.
Throughout the project, the scope was continually evolving in response to ongoing client requests and changing priorities. These variations required careful management to ensure that expectations were clearly communicated and aligned with both budget and programme constraints. With budgets remaining tight, certain elements of the original scope were omitted or re-sequenced to accommodate higher-priority client requirements, ensuring maximum value was retained within the available funding.
These adjustments necessitated close coordination with the wider supply chain, with several elements of the design—particularly the mechanical and electrical (M&E) installations—being revisited and re-engineered to reflect the revised scope. This collaborative and solutions-focused approach was essential in maintaining progress and ensuring design integrity was preserved throughout delivery.
In addition, unforeseen challenges were encountered during the works, including the discovery of asbestos. These issues were managed promptly and effectively, with appropriate mitigation measures implemented to ensure safe removal and minimal disruption to the programme.
Key improvements included a new composite roof, upgraded cladding systems, modern building services, enhanced fire safety measures, improved site access arrangements, and high-quality office accommodation. The completed development provides a durable, energy-efficient industrial asset, ready to support the requirements of future occupiers while increasing the long-term value and marketability of the property.
TJ Elsdon delivers refurbishment projects with care, control, and attention to detail that professional teams expect.
Deliver a phased refurbishment and redevelopment project
Undertake a targeted refurbishment of office units
Undertake a comprehensive refurbishment and upgrade of an industrial facility